ADVERTISEMENT

Coming soon...

This thread clearly needs further clarification namely what is the topic and why is the video unavailable?
The video is available to me. It shows 3 workmen doing their thing on an inside structure. I'm assuming it is the b-ball practice facility? One guy is spackling, another on a Skill saw, and another doing overhead work. Looks like wires and fiber optic cables draped along the ceiling.
 
The video is available to me. It shows 3 workmen doing their thing on an inside structure. I'm assuming it is the b-ball practice facility? One guy is spackling, another on a Skill saw, and another doing overhead work. Looks like wires and fiber optic cables draped along the ceiling.
It's the new RAC weight room.
 
So is there not going to be a weight room in the new practice facility? Or is there going to be two? Maybe it will be used by other sports? Need more details on this.
 
Yes, there will be a strength and conditioning center in the new facility. Even with Men's & Women's Basketball moving out of the RAC there will still be teams with locker rooms/offices in the RAC. Baseball and Softball for sure. Probably track & field, field hockey, others?

In any event, we're still 28 months away from Hobbs's target to open the new facility in July 2019.

New facility renderings / info available on Big Ten Build Fund site:
http://www.rutgersbigtenbuild.com/multisport-training-complex/index.html
 
Great......another Basketball upgrade to show the 2017 recruits this spring and the 2018 recruits as they visit up to the fall signing period.
 
ADVERTISEMENT
ADVERTISEMENT