You could actually do a lot with the RAC now.
-You no longer need the folding bleachers as no one will be using it for practice any longer.
-All the coaching offices are being moved, you can now reconfigure and use that space.
-I know 118 was changed to some stupid temporary idea but that area can now have permanent seating, no longer folding.
-You can then make the 300's with seating and not lose capacity.
-There's no longer a need to have a gym in the building that could be used for more concessions and bathrooms.
-Exterior sheet metal and elastomeric paint are cheap and you can do wonders with it.
-Also love
@2003alyssa idea, this is an arena not a high school gym get rid of the doors everywhere except the entrance and exits.