It’s a two phase build. First is the turf with some small stands. We won’t be playing official games there. Second phase is 6,000 seats. Two six figure donations were announced. Fundraising needs to continue.I hear that BB is going to be sharing the full lax stadium plans with alumni tonight. If so, hopefully our resident board alumni will be able to share tidbits with the board (if permitted).
Holy crap, 6,000 seats?! OSU’s only has capacity for 2,100 or something.It’s a two phase build. First is the turf with some small stands. We won’t be playing official games there. Second phase is 6,000 seats. Two six figure donations were announced. Fundraising needs to continue.
It’s a priority. Donate if you can. Building in NJ is insanely expensive. Check out what Clemson built for their women’s team for $20MM. Full stadium, weight room, lockerrom, everything.
Our field costs $10MM